[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- 36 turbines: (manufacturer name not available)
- Total nominal power: 75,600 kW
- Under construction
- Onshore wind farm
Part #2:
- Part: Part 2
- 36 turbines: (manufacturer name not available)
- Total nominal power: 75,600 kW
- Under construction
- Onshore wind farm
Localisation
Part #1:
- Part: Part 1
- Latitude: 21° 16' 4.8"
- Longitude: -89° 11' 49.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 21° 16' 4.8"
- Longitude: -89° 11' 49.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: