[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Oleiros, Sertã
- Commissioning:
- 17 turbines: Enercon E40/600 (power 600 kW, diameter 40 m)
- Total nominal power: 10,200 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:
- Source:
Part #2:
- City: Oleiros, Sertã
- Commissioning:
- 3 turbines: Enercon E66/2000 (power 2 000 kW, diameter 66 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:
- Source:
Part #3:
- City: Oleiros, Sertã
- Commissioning:
- 3 turbines: Enercon E66/2000 (power 2 000 kW, diameter 66 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:
- Source:
Part #4:
- City: Oleiros, Sertã
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:
Part #5:
- City: Oleiros, Sertã
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Update for this sheet: 0
Complete/correct this sheet: