[Back to previous page]
Generalities
|
|
Details
- Commissioning:
- 7 turbines: GE Energy 3.2-103 (power 3 200 kW, diameter 103 m)
- Total nominal power: 19,950 kW (downrated turbines)
- Operational
- Onshore wind farm
- Developer: Maeda Construction
Localisation
Update for this sheet: 6 November 2023
Complete/correct this sheet: