Part #1:
- City: Daliu
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #3:
- Part: Part 2
- City: Dacao Zhen
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #4:
- Part: Part 2
- City: Baodian
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #5:
- Part: Part 2
- City: Daliu
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Under construction
- Onshore wind farm
Localisation
Part #1:
- Latitude: 37° 48' 32.3"
- Longitude: 116° 52' 4.7"
- Geodetic system: WGS84
- Precise localization: no
Part 2 : no data.
Part 3 : no data.
Part #4:
- Part: Part 2
- Latitude: 37° 36' 7.1"
- Longitude: 116° 35' 27.5"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Part: Part 2
- Latitude: 37° 47' 9.6"
- Longitude: 116° 58' 1.1"
- Geodetic system: WGS84
- Precise localization: no