[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- City: Wenggongwula Sumu
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Part 2
- City: Wengongwula
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Under construction
- Onshore wind farm
Localisation
Part #1:
- Part: Part 1
- Latitude: 42° 31' 22.8"
- Longitude: 113° 59' 27.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 42° 32' 34.7"
- Longitude: 114° 3' 46.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 October 2023
Complete/correct this sheet: