[Back to previous page]
Generalities
|
|
Details
- City: Ganqimaodu Town-Wulatezhong Banner-Bayannaoer Municipality
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 42° 24' 10.7"
- Longitude: 107° 34' 44.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 October 2023
Complete/correct this sheet: