[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Ventos de Santa Tereza 01
- City: Pedro Avelino
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Operational
- Onshore wind farm
- Operator: AES
- Owner:
Part #2:
- Part: Ventos de Santa Tereza 02
- City: Pedro Avelino
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Under construction
- Onshore wind farm
- Operator: AES
- Owner:
Part #3:
- Part: Ventos de Santa Tereza 03
- City: Pedro Avelino
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Under construction
- Onshore wind farm
- Operator: AES
- Owner:
Part #4:
- Part: Ventos de Santa Tereza 04
- City: Pedro Avelino
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Under construction
- Onshore wind farm
- Operator: AES
- Owner:
Part #5:
- Part: Ventos de Santa Tereza 05
- City: Angicos
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Operational
- Onshore wind farm
- Operator: AES
- Owner:
Part #6:
- Part: Ventos de Santa Tereza 07
- City: Angicos
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,000 kW
- Under construction
- Onshore wind farm
- Operator: AES
- Owner:
Part #7:
- Part: Ventos de Santa Tereza 08
- City: Angicos
- Turbine(s): (manufacturer name not available)
- Total nominal power: 39,000 kW
- Under construction
- Onshore wind farm
- Operator: AES
- Owner:
Part #8:
- Part: Ventos de Santa Tereza 10
- City: Angicos
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 39,000 kW
- Operational
- Onshore wind farm
- Operator: AES
- Owner:
Part #9:
- Part: Ventos de Santa Tereza 12
- City: Fernando Pedroza
- Turbine(s): (manufacturer name not available)
- Total nominal power: 39,000 kW
- Under construction
- Onshore wind farm
- Operator: AES
- Owner:
Part #10:
- Part: Ventos de Santa Tereza 13
- City: Fernando Pedroza
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 39,000 kW
- Operational
- Onshore wind farm
- Operator: AES
- Owner:
Part #11:
- Part: Ventos de Santa Tereza 14
- City: Fernando Pedroza
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 39,000 kW
- Operational
- Onshore wind farm
- Operator: AES
- Owner:
Localisation
Part #1:
- Part: Ventos de Santa Tereza 01
- Latitude: -5° 36' 28.7"
- Longitude: -36° 16' 12"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Ventos de Santa Tereza 02
- Latitude: -5° 37' 15.6"
- Longitude: -36° 16' 40.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Ventos de Santa Tereza 03
- Latitude: -5° 38' 2.4"
- Longitude: -36° 16' 58.8"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Ventos de Santa Tereza 04
- Latitude: -5° 38' 49.2"
- Longitude: -36° 17' 20.4"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Part: Ventos de Santa Tereza 05
- Latitude: -5° 39' 39.5"
- Longitude: -36° 17' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Part: Ventos de Santa Tereza 07
- Latitude: -5° 39' 46.8"
- Longitude: -36° 17' 52.8"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Part: Ventos de Santa Tereza 08
- Latitude: -5° 40' 51.5"
- Longitude: -36° 18' 10.7"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Part: Ventos de Santa Tereza 10
- Latitude: -5° 41' 13.2"
- Longitude: -36° 16' 26.4"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Part: Ventos de Santa Tereza 12
- Latitude: -5° 43' 11.9"
- Longitude: -36° 17' 13.1"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Part: Ventos de Santa Tereza 13
- Latitude: -5° 43' 44.4"
- Longitude: -36° 17' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Part: Ventos de Santa Tereza 14
- Latitude: -5° 44' 27.5"
- Longitude: -36° 17' 52.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 26 April 2024
Complete/correct this sheet: