Generalities
|
|
Details
Part #1:
- City: Nidderdale, Harrogate
- Commissioning:

- 4 turbines: Repower MM70 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: RWE
- Operator: RWE
Part #2:
- City: Nidderdale, Harrogate
- 4 turbines: (manufacturer name not available)
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: RWE
- Operator: RWE
Localisation
Part #1:
Part #2:
- Latitude: 53° 59' 53.3"
- Longitude: -1° 38' 52.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 August 2023