[Back to previous page]
Generalities
|
|
Details
- City: Douglas
- Commissioning:
- 14 turbines: (manufacturer name not available)
- Total nominal power: 79,000 kW
- Operational
- Onshore wind farm
- Developer: Scottish Power
- Operator: Scottish Power
- Source:
Localisation
- Latitude: 55° 33' 17.4"
- Longitude: -3° 55' 16.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 August 2024
Complete/correct this sheet: