[Back to previous page]
Generalities
|
|
Details
- Commissioning:
- 4 turbines: Siemens-Gamesa SG 4.5-145 (power 4 500 kW, diameter 145 m)
- Total nominal power: 16,000 kW (downrated turbines)
- Operational
- Onshore wind farm
- Owner:
Localisation
Update for this sheet: 20 September 2024
Complete/correct this sheet: