[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Jülich
- Commissioning:
- 6 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Developer: Energiekontor
- Operator: Energiekontor
- Owner:
- Source:
Part #2:
- City: Jülich
- Commissioning:
- 2 turbines: GE Energy 5.5-158 (power 5 500 kW, diameter 158 m)
- Hub height:
- Total nominal power: 11,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Jülich
- Commissioning:
- 2 turbines: Nordex N149/5.X (power 5 000 kW, diameter 149.1 m)
- Hub height:
- Total nominal power: 11,400 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: REA Düren
- Source:
Part #4:
- City: Jülich
- Commissioning:
- 3 turbines: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
- Hub height:
- Total nominal power: 13,500 kW
- Operational
- Onshore wind farm
Part #5:
- City: Aldenhoven
- Commissioning:
- 2 turbines: GE Energy 5.3-158 (power 5 300 kW, diameter 158 m)
- Hub height:
- Total nominal power: 10,600 kW
- Operational
- Onshore wind farm
- Developer: REA Düren
- Source:
Part #6:
- City: Jülich
- Commissioning:
- 4 turbines: Vestas V162/6.2MW (power 6 200 kW, diameter 162 m)
- Hub height:
- Total nominal power: 24,800 kW
- Operational
- Onshore wind farm
- Operator: MVV Energie
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
- Latitude: 50° 53' 25.2"
- Longitude: 6° 18' 51.5"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 50° 58' 10.5"
- Longitude: 6° 25' 32"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 December 2024
Complete/correct this sheet: