[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Neufeld
- Commissioning:
- 3 turbines: Nordex N54/1000 (power 1 000 kW, diameter 54 m)
- Hub height:
- Total nominal power: 3,000 kW
- Dismantled
- Onshore wind farm
- Developer: Denker&Wulf
Part #2:
- City: Neufeld
- Commissioning:
- 4 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height:
- Total nominal power: 13,600 kW
- Operational
- Onshore wind farm
Part #3:
- City: Neufeld
- Commissioning:
- 4 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Hub height:
- Total nominal power: 13,600 kW
- Operational
- Onshore wind farm
- Developer: Denker&Wulf
Part #4:
- City: Neufeld
- Commissioning:
- 2 turbines: Enercon E115/4200 (power 4 200 kW, diameter 115.7 m)
- Hub height:
- Total nominal power: 8,400 kW
- Operational
- Onshore wind farm
- Operator: Denker&Wulf
Part #5:
- City: Neufeld
- Commissioning:
- 2 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 54' 56.2"
- Longitude: 9° 3' 58.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 54' 56.5"
- Longitude: 9° 4' 23.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 54' 56.5"
- Longitude: 9° 4' 23.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 55' 16.8"
- Longitude: 9° 3' 45.9"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 53° 55' 16.8"
- Longitude: 9° 3' 45.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 28 October 2023
Complete/correct this sheet: