[Back to previous page]
Generalities
- Wind farm name: Elk City Wind II
- Country: USA
- County / Zone: Oklahoma
|
|
Details
Part #1:
- City: Roger Mills, Beckham
- Commissioning:
- 48 turbines: GE Energy 1.5xle (power 1 500 kW, diameter 82.5 m)
- Hub height:
- Total nominal power: 72,000 kW
- Dismantled (2018)
- Onshore wind farm
- Source:
Part #2:
- City: Roger Mills, Beckham
- Commissioning:
- 18 turbines: GE Energy 1.5xle (power 1 500 kW, diameter 82.5 m)
- Hub height:
- Total nominal power: 27,000 kW
- Dismantled (2018)
- Onshore wind farm
- Source:
Part #3:
- Part: Repowering
- City: Roger Mills, Beckham
- Commissioning:
- 18 turbines: GE Energy
- Hub height:
- Total nominal power: 29,160 kW
- Operational
- Onshore wind farm
- Operator: NextEra Energy Resources
- Owner:
Part #4:
- Part: Repowering
- City: Roger Mills, Beckham
- Commissioning:
- 48 turbines: GE Energy
- Hub height:
- Total nominal power: 72,000 kW
- Operational
- Onshore wind farm
- Operator: NextEra Energy Resources
- Owner:
- Source:
Localisation
Part #1:
- Latitude: 35° 27' 29.3"
- Longitude: -99° 40' 19"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 35° 27' 29.3"
- Longitude: -99° 40' 19"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Repowering
- Latitude: 35° 27' 29.3"
- Longitude: -99° 40' 19"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Part: Repowering
- Latitude: 35° 27' 29.3"
- Longitude: -99° 40' 19"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: