[Back to previous page]
Generalities
|
|
Details
Part #1:
Part #2:
Part #3:
- City: Fuqiang
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 150,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 47° 17' 2.3"
- Longitude: 131° 56' 49.2"
- Geodetic system: WGS84
- Precise localization: no
Part 2 : no data.
Part #3:
- Latitude: 47° 17' 16.7"
- Longitude: 131° 39' 53.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 18 October 2023
Complete/correct this sheet: