Part #1:
- City: Chaganaobao Gacha
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Adjoining Baiyunebo
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: State Power Investment Group
Part #3:
- City: Bailingmiao
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
Part #4:
- City: Barun
- 83 turbines: Goldwind GWH171-5.3 (power 5 300 kW, diameter 171 m)
- Total nominal power: 439,900 kW
- Under construction
- Onshore wind farm
Part #5:
- City: Damao Banner
- 10 turbines: Goldwind GWH171-6.0 (power 6 000 kW, diameter 171 m)
- Total nominal power: 60,000 kW
- Under construction
- Onshore wind farm
Part #6:
- City: Baotou
- Turbine(s): (manufacturer name not available)
- Total nominal power: 120,000 kW
- Under construction
- Onshore wind farm
Part #7:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Operator: Jinjie New Energy Co
Part #8:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Damao Banner Tianrun Windpower Co
Part #9:
- Part: Part 2
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 20,000 kW
- Operational
- Onshore wind farm
- Operator: Jinjie New Energy Co
Part #10:
- Part: Part 2
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Damao Banner Tianrun Windpower Co
Part #11:
- Part: Part 3
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Damao Banner Tianrun Windpower Co
Localisation
Part #1:
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 41° 31' 1.2"
- Longitude: 110° 35' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 41° 46' 8.3"
- Longitude: 109° 53' 6"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 40° 38' 9.6"
- Longitude: 109° 50' 52.7"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 41° 52' 58.8"
- Longitude: 109° 52' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Part: Part 1
- Latitude: 41° 23' 31.2"
- Longitude: 110° 59' 20.4"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Part: Part 1
- Latitude: 41° 46' 12"
- Longitude: 109° 43' 48"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Part: Part 2
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Part: Part 2
- Latitude: 41° 45' 46.7"
- Longitude: 109° 35' 56.4"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Part: Part 3
- Latitude: 41° 44' 5.9"
- Longitude: 109° 33' 10.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 May 2024
Complete/correct this sheet: