[Back to previous page]
Generalities
|
|
Details
Part #1:
Part #2:
- Part: Part 2
- City: Keshiteng Banner
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Part: Part 1
- Latitude: 42° 38' 59.9"
- Longitude: 117° 47' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 42° 42' 57.6"
- Longitude: 117° 50' 27.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2020
Complete/correct this sheet: