[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Baxingtu Gacha
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 200,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Barunbiela Zhen
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 200,000 kW
- Operational
- Onshore wind farm
Part #3:
Part #4:
Localisation
Part #1:
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Part 1
- Latitude: 38° 12' 50.3"
- Longitude: 105° 33' 10.7"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Part 2
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 29 August 2022
Complete/correct this sheet: