[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hongge’er Zhen
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 150,000 kW
- Operational
- Onshore wind farm
Part #2:
Part #3:
- City: Hongge’er Zhen
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 176,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 43° 19' 30"
- Longitude: 115° 38' 49.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 43° 28' 58.7"
- Longitude: 115° 55' 58.8"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 43° 19' 30"
- Longitude: 115° 38' 49.2"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 29 August 2022
Complete/correct this sheet: