[Back to previous page]
Generalities
|
|
Details
Part #1:
Part #2:
- City: Hongnijingcun
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Hongnijingcun
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 48,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 41° 27' 0"
- Longitude: 109° 42' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 41° 23' 5.9"
- Longitude: 109° 48' 53.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2020
Complete/correct this sheet: