[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Part 2
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Part: Part 1
- Latitude: 45° 27' 54"
- Longitude: 119° 24' 21.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 45° 25' 55.2"
- Longitude: 119° 20' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2020