[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Inner Mongolia Damo Windpower Co
Part #2:
- Part: Part 2
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 48,000 kW
- Operational
- Onshore wind farm
- Operator: Inner Mongolia Damo Windpower Co
Localisation
Part #1:
- Part: Part 1
- Latitude: 41° 21' 43.2"
- Longitude: 106° 29' 16.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 41° 22' 1.1"
- Longitude: 106° 27' 0"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2020
Complete/correct this sheet: