[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: LongYuan
Part #2:
- Part: Part 2
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: LongYuan
Localisation
Part #1:
- Part: Part 1
- Latitude: 45° 15' 18"
- Longitude: 121° 41' 49.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 45° 15' 20.1"
- Longitude: 121° 41' 9.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 October 2020
Complete/correct this sheet: