Generalities
|
|
Details
Part #1:
Part #2:
- City: Xinghe
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 500,000 kW
- Operational
- Onshore wind farm
Part #3:
Part #4:
- Part: Part 2
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 41° 8' 31.2"
- Longitude: 113° 15' 28.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 40° 38' 13.2"
- Longitude: 113° 50' 38.3"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Part 1
- Latitude: 43° 14' 38.3"
- Longitude: 114° 19' 30"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Part 2
- Latitude: 41° 19' 44.4"
- Longitude: 113° 34' 26.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 May 2024