[Back to previous page]
Generalities
|
|
Details
- City: Oga
- Commissioning:
- 7 turbines: Senvion 3.4M104 (power 3 400 kW, diameter 104 m)
- Total nominal power: 19,950 kW (downrated turbines)
- Operational
- Onshore wind farm
- Developer: Japan Wind Development
- Owner:
Localisation
Update for this sheet: 20 September 2024
Complete/correct this sheet: