The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Dongying Hekou (China)


Sign up    Log in    Search

[Back to previous page]

China wind farms file

 

General data

  Map  

Generalities

  • Wind farm name: Dongying Hekou
  • Country: China
  • County / Zone: Shandong

Details


Part #1:

  • City: Dongying
  • Commissioning:
  • 24 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
  • Total nominal power: 49,200 kW
  • Operational
  • Onshore wind farm
  • Developer: CLP Group
  • Operator: CLP Group
  • Owners: /
  • Source: Reserved for Premium Access

Part #2:

  • City: Dongying
  • Commissioning:
  • 1 turbine: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
  • Total nominal power: 2,050 kW
  • Operational
  • Onshore wind farm
  • Developer: CLP Group
  • Operator: CLP Group
  • Owners: /
  • Source: Reserved for Premium Access

Part #3:

  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 48,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Huaneng New Energy Co

Part #4:

  • Part: Part 1
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Guohua

Part #5:

  • Part: Part 2
  • Commissioning:
  • 33 turbines: Goldwind GW82/1500 (power 1 500 kW, diameter 82.3 m)
  • Total nominal power: 49,500 kW
  • Operational
  • Onshore wind farm
  • Operator: Guohua

Part #6:

  • Part: Part 3
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Guohua

Part #7:

  • Part: Part 4
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Guohua

Part #8:

  • Part: Part 5
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Guohua

Part #9:

  • Part: Part 6
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Guohua

Localisation


Part #1:

  • Latitude: 37° 53' 10"
  • Longitude: 118° 31' 32"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 37° 53' 10"
  • Longitude: 118° 31' 32"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 37° 59' 51.3"
  • Longitude: 118° 56' 36.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Part: Part 1
  • Latitude: 38° 5' 50.9"
  • Longitude: 118° 18' 55.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Part: Part 2
  • Latitude: 38° 4' 27.8"
  • Longitude: 118° 16' 32.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Part: Part 3
  • Latitude: 38° 4' 14.8"
  • Longitude: 118° 21' 48.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Part: Part 4
  • Latitude: 38° 3' 59.7"
  • Longitude: 118° 19' 3.7"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Part: Part 5
  • Latitude: 38° 3' 27.3"
  • Longitude: 118° 19' 19.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Part: Part 6
  • Latitude: 38° 4' 23.5"
  • Longitude: 118° 19' 3.3"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 19 September 2022
Complete/correct this sheet:



The Wind Power
All rights reserved - 2005-2024 - Cookie Policy
Conditions of Use and Sale - Partners
The Wind Power LinkedIn page  The Wind Power Twitter page