[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Struckum
- Commissioning:
- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #2:
- City: Struckum
- Commissioning:
- 4 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Hub height:
- Total nominal power: 8,200 kW
- Operational
- Onshore wind farm
Part #3:
- City: Struckum
- Commissioning:
- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #4:
- City: Struckum
- Commissioning:
- 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
Part #5:
- City: Struckum
- Commissioning:
- 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
Part #6:
- City: Struckum
- Commissioning:
- 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 54° 34' 51.5"
- Longitude: 8° 58' 8.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 35' 8"
- Longitude: 8° 57' 57.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 54° 34' 37.1"
- Longitude: 8° 58' 32.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 54° 35' 8"
- Longitude: 8° 57' 57.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 54° 35' 8"
- Longitude: 8° 57' 57.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 54° 34' 54.3"
- Longitude: 8° 58' 18.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 September 2022
Complete/correct this sheet: