Part #1:
- City: Kronprinzenkoog
- Commissioning:
- 5 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Hub height:
- Total nominal power: 10,250 kW
- Operational
- Onshore wind farm
Part #2:
- City: Kronprinzenkoog
- Commissioning:
- 3 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:
- Total nominal power: 6,150 kW
- Operational
- Onshore wind farm
Part #3:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:
- Total nominal power: 3,050 kW
- Operational
- Onshore wind farm
Part #4:
- City: Kronprinzenkoog
- Commissioning:
- 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
Part #5:
- City: Kronprinzenkoog
- Commissioning:
- 2 turbines: Senvion
- Hub height:
- Total nominal power: 4,100 kW
- Operational
- Onshore wind farm
Part #6:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Hub height:
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #7:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #8:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #9:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #10:
- City: Kronprinzenkoog
- Commissioning:
- 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
Part #11:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E82/3000 (power 3 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #12:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Enercon E82/3000 (power 3 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #13:
- City: Kronprinzenkoog
- Commissioning:
- 1 turbine: Repower MM92 (power 2 000 kW, diameter 92 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 58' 17.3"
- Longitude: 8° 57' 41.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 58' 17.3"
- Longitude: 8° 57' 41.8"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 53° 57' 36"
- Longitude: 8° 56' 42"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 57' 40"
- Longitude: 8° 58' 9.5"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 53° 59' 15.4"
- Longitude: 8° 58' 9.6"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 54° 1' 4.5"
- Longitude: 8° 59' 51.3"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 53° 57' 51.8"
- Longitude: 8° 57' 5.3"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 53° 58' 2"
- Longitude: 8° 57' 8.3"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 53° 57' 29.1"
- Longitude: 8° 57' 2.3"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Latitude: 53° 57' 14"
- Longitude: 8° 57' 44.9"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 53° 57' 44.1"
- Longitude: 8° 56' 27.2"
- Geodetic system: WGS84
- Precise localization: no
Part #12:
- Latitude: 53° 57' 22.4"
- Longitude: 8° 56' 56.4"
- Geodetic system: WGS84
- Precise localization: no
Part #13:
- Latitude: 53° 57' 40.5"
- Longitude: 8° 58' 38"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 September 2022
Complete/correct this sheet: