[Back to previous page]
Generalities
|
|
Details
- City: Nordwalde
- Commissioning:

- 1 turbine: Enercon E30/200 (power 200 kW, diameter 30 m)
- Hub height:

- Total nominal power: 200 kW
- Dismantled (2020/04)
- Onshore wind farm
Localisation
- Latitude: 52° 6' 43.8"
- Longitude: 7° 30' 49.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 7 September 2022
Complete/correct this sheet: