[Back to previous page]
Generalities
|
|
Details
- City: Bitterfeld-Wolfen
- Commissioning:
- 2 turbines: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 51° 38' 55.5"
- Longitude: 12° 12' 37.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 10 September 2022
Complete/correct this sheet: