[Back to previous page]
Generalities
|
|
Details
- City: Hopsten
- Commissioning:
- 2 turbines: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
- Hub height:
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 52° 26' 9.9"
- Longitude: 7° 35' 10.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 October 2023
Complete/correct this sheet: