[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Fase 1
- City: Mallén, Gallur, Magallón
- Turbine(s): (manufacturer name not available)
- Total nominal power: 45,570 kW
- Operational
- Onshore wind farm
- Developer: Forestalia
Part #2:
- Part: Fase 2
- City: Mallén, Gallur, Magallón
- Turbine(s): (manufacturer name not available)
- Total nominal power: 3,830 kW
- Operational
- Onshore wind farm
- Developer: Forestalia
Localisation
Part #1:
- Part: Fase 1
- Latitude: 41° 53' 6.2"
- Longitude: -1° 26' 19.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Fase 2
- Latitude: 41° 53' 6.2"
- Longitude: -1° 26' 19.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 January 2024
Complete/correct this sheet: