Generalities
|
|
Details
Part #1:
Part #2:
- Part: Fase 2
- City: Cañete la Real
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 23,625 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Part: Fase 1
- Latitude: 36° 57' 5.2"
- Longitude: -5° 1' 27.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Fase 2
- Latitude: 36° 57' 5.2"
- Longitude: -5° 1' 27.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 January 2024