[Back to previous page]
Generalities
|
|
Details
- City: Langstedt
- Commissioning:
- 2 turbines: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
- Hub height:
- Total nominal power: 8,400 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: WKN AG
Localisation
- Latitude: 54° 36' 58.9"
- Longitude: 9° 25' 48"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 28 October 2023
Complete/correct this sheet: