[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:
- 16 turbines: XEMC-Darwind
- Total nominal power: 51,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning:
- 73 turbines: CSIC HZ Windpower
- Total nominal power: 248,200 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 41° 31' 40.9"
- Longitude: 105° 51' 19.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 41° 31' 40.9"
- Longitude: 105° 51' 19.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: