[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Eeklo
- Commissioning:
- 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:
- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
- Operator: Ecopower
- Owner:
- Source:
Part #2:
- City: Eeklo
- Commissioning:
- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: Ecopower
- Operator: Ecopower
- Owner:
- Source:
Part #3:
- City: Eeklo
- Commissioning:
- 1 turbine: Senvion MM100 (power 2 000 kW, diameter 100 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Owner:
Part #4:
- City: Eeklo
- Commissioning:
- 2 turbines: (manufacturer name not available)
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Owner:
Part #5:
- City: Eeklo
- Commissioning:
- 5 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:
- Total nominal power: 10,250 kW
- Operational
- Onshore wind farm
- Owner:
Part #6:
- City: Eeklo
- Commissioning:
- 4 turbines: (manufacturer name not available)
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developer: Elicio
- Operator: Elicio
- Owner:
- Source:
Part #7:
- City: Eeklo
- Commissioning:
- 3 turbines: (manufacturer name not available)
- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Owner:
Part #8:
- City: Eeklo
- Commissioning:
- 1 turbine: Vestas V100/2200 (power 2 200 kW, diameter 100 m)
- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
- Owner:
Part #9:
- City: Eeklo
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Owner:
Part #10:
- Part: Honderdbundermolen
- City: Eeklo
- Commissioning:
- 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height:
- Total nominal power: 500 kW (downrated turbine)
- Operational
- Onshore wind farm
- Developer: Aspiravi
- Operator: Ecopower
- Owner:
- Source:
Part #11:
- Part: Honderdbundermolen
- City: Eeklo
- Commissioning:
- 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height:
- Total nominal power: 600 kW
- Dismantled
- Onshore wind farm
- Developer: Aspiravi
Part #12:
- Part: Transeeklo
- City: Eeklo
- Commissioning:
- 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developer: Aspiravi
- Source:
Localisation
Part #1:
- Latitude: 51° 10' 47"
- Longitude: 3° 31' 58.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 10' 46.3"
- Longitude: 3° 31' 58.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 12' 19.1"
- Longitude: 3° 35' 10.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 11' 48.1"
- Longitude: 3° 33' 32.5"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 51° 12' 19.1"
- Longitude: 3° 35' 10.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 51° 11' 48.1"
- Longitude: 3° 33' 32.5"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 51° 11' 48.1"
- Longitude: 3° 33' 32.5"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Latitude: 51° 11' 48.1"
- Longitude: 3° 33' 32.5"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Latitude: 51° 11' 48.1"
- Longitude: 3° 33' 32.5"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Part: Honderdbundermolen
- Latitude: 51° 11' 47.3"
- Longitude: 3° 34' 2.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #11:
- Part: Honderdbundermolen
- Latitude: 51° 11' 47.3"
- Longitude: 3° 34' 2.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #12:
- Part: Transeeklo
- Latitude: 51° 10' 52.7"
- Longitude: 3° 32' 26"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: