[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 3
- City: Grant, Codington
- Commissioning:

- 32 turbines: Nordex N149/4.0-4.5 (power 4 500 kW, diameter 149.1 m)
- Hub height:

- Total nominal power: 153,600 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: Apex Wind Energy
- Operator: Alliant Energy
- Owner:

- Source:

Part #2:
- Part: Parts 1&2
- City: Grant, Codington
- Commissioning:

- 1 turbine: Vestas V120/2200 (power 2 200 kW, diameter 120 m)
- Hub height:

- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
- Operator: Alliant Energy
- Owner:

Part #3:
- Part: Parts 1&2
- City: Grant, Codington
- Commissioning:

- 64 turbines: Vestas V136/4000-4200 (power 4 000 kW, diameter 136 m)
- Hub height:

- Total nominal power: 275,200 kW (uprated turbines)
- Operational
- Onshore wind farm
- Operator: Alliant Energy
- Owner:

Part #4:
- Part: Parts 1&2
- City: Grant, Codington
- Commissioning:

- 7 turbines: Vestas V136/4000-4200 (power 4 000 kW, diameter 136 m)
- Hub height:

- Total nominal power: 26,600 kW (downrated turbines)
- Operational
- Onshore wind farm
- Operator: Alliant Energy
- Owner:

Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Update for this sheet: 0
Complete/correct this sheet: