[Back to previous page]
Generalities
|
|
Details
- Commissioning:
- 4 turbines: (manufacturer name not available)
- Total nominal power: 9,400 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 56° 18' 30.2"
- Longitude: -3° 20' 21.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: