Generalities
|
|
Details
Part #1:
Part #2:
- Part: Fase II
- City: Monforte de Moyuela, Loscos
- Turbine(s): (manufacturer name not available)
- Total nominal power: 30,400 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: Fuerzas Energéticas Sur de Europa
Localisation
Part #1:
- Part: Fase I
- Latitude: 41° 4' 9.2"
- Longitude: -1° 1' 46.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Fase II
- Latitude: 41° 4' 9.2"
- Longitude: -1° 1' 46.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 January 2024
Complete/correct this sheet: