[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Friedland
- Commissioning:
- 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Friedland-Nordwest
- City: Friedland
- Commissioning:
- 4 turbines: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
- Hub height:
- Total nominal power: 5,200 kW
- Operational
- Onshore wind farm
- Owner:
- Source:
Part #3:
- Part: Friedland-Nordwest
- City: Friedland
- Commissioning:
- 2 turbines: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developer: MBBF
- Operator: MBBF
- Source:
Part #4:
- Part: Friedland-Nordwest
- City: Friedland
- Commissioning:
- 5 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
Part #5:
- Part: Friedland-Nordwest
- City: Friedland
- Commissioning:
- 1 turbine: Nordex N60/1300 (power 1 300 kW, diameter 60 m)
- Hub height:
- Total nominal power: 1,300 kW
- Operational
- Onshore wind farm
Part #6:
Part #7:
- Part: Friedland-Süd
- City: Friedland
- Commissioning:
- 4 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
Part #8:
- Part: Friedland-Süd
- City: Friedland
- Commissioning:
- 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Alme Windkraft
- Operator: Alme Windkraft
- Owner:
- Source:
Localisation
Part #1:
- Latitude: 53° 38' 44.1"
- Longitude: 13° 33' 55.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
Part #3:
Part #4:
Part #5:
Part #6:
Part #7:
Part #8:
Update for this sheet: 18 June 2024
Complete/correct this sheet: