[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Lorup
- Commissioning:
- 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Lorup
- Commissioning:
- 1 turbine: Enercon E141/4200 (power 4 200 kW, diameter 141 m)
- Hub height:
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Part #3:
- City: Lorup
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #4:
- City: Lorup
- Commissioning:
- 3 turbines: Enercon E141/4200 (power 4 200 kW, diameter 141 m)
- Hub height:
- Total nominal power: 12,600 kW
- Operational
- Onshore wind farm
Part #5:
- City: Lorup
- Commissioning:
- 4 turbines: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #6:
- City: Lorup
- Commissioning:
- 14 turbines: Enercon E141/4200 (power 4 200 kW, diameter 141 m)
- Hub height:
- Total nominal power: 58,800 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 55' 28.2"
- Longitude: 7° 41' 34"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 55' 26.7"
- Longitude: 7° 34' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 52° 55' 26.7"
- Longitude: 7° 34' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 52° 55' 26.7"
- Longitude: 7° 34' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 52° 55' 26.7"
- Longitude: 7° 34' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 52° 55' 26.7"
- Longitude: 7° 34' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 26 August 2022
Complete/correct this sheet: