[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Atteln-Lichtenau
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #2:
- City: Atteln-Lichtenau
- Commissioning:

- 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Atteln-Lichtenau
- Commissioning:

- 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #4:
- City: Atteln-Lichtenau
- Commissioning:

- 1 turbine: Vestas V126/3450 (power 3 450 kW, diameter 126 m)
- Hub height:

- Total nominal power: 3,450 kW
- Operational
- Onshore wind farm
Part #5:
- City: Atteln-Lichtenau
- Commissioning:

- 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Update for this sheet: 26 August 2022
Complete/correct this sheet: