[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Kröpelin
- Commissioning:
- 1 turbine: e.n.o. energy 114 3.5 MW (power 3 500 kW, diameter 114.9 m)
- Hub height:
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
Part #2:
- City: Kröpelin
- Commissioning:
- 1 turbine: e.n.o. energy 114 3.5 MW (power 3 500 kW, diameter 114.9 m)
- Hub height:
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
Part #3:
- City: Kröpelin
- Commissioning:
- 1 turbine: Enercon E126/3500 (power 3 500 kW, diameter 126 m)
- Hub height:
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
Part #4:
- City: Kröpelin
- Commissioning:
- 1 turbine: e.n.o. energy 126 4.8 MW (power 4 800 kW, diameter 126 m)
- Hub height:
- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
Part #5:
- City: Kröpelin
- Commissioning:
- 1 turbine: e.n.o. energy 126 4.8 MW (power 4 800 kW, diameter 126 m)
- Hub height:
- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 54° 4' 3.4"
- Longitude: 11° 50' 32.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 4' 3.4"
- Longitude: 11° 50' 32.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 54° 4' 3.4"
- Longitude: 11° 50' 32.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 54° 4' 20.6"
- Longitude: 11° 50' 10.3"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 54° 3' 51.3"
- Longitude: 11° 50' 47.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 27 October 2023
Complete/correct this sheet: