[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Lingcheng
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Operator: Huarun New Energy
Part #2:
- Part: Part 1
- City: Lingcheng
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Under construction
- Onshore wind farm
Part #3:
- Part: Part 2
- City: Lingcheng
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Under construction
- Onshore wind farm
Localisation
Part #1:
- Latitude: 37° 24' 12.3"
- Longitude: 116° 39' 23.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 1
- Latitude: 37° 24' 12.3"
- Longitude: 116° 39' 23.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Part 2
- Latitude: 37° 24' 10.7"
- Longitude: 116° 39' 25.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 May 2024
Complete/correct this sheet: