[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 30 turbines: Nordex N100/3300 (power 3 300 kW, diameter 99.8 m)
- Total nominal power: 102,000 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: AES Argentina
- Operator: AES Argentina
- Owner:

Localisation
Update for this sheet: 9 July 2024
Complete/correct this sheet: