[Back to previous page]
Generalities
|
|
Details
- City: Härnösand
- Commissioning:
- 2 turbines: Nordex N100/2500 (power 2 500 kW, diameter 100 m)
- Hub height:
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 62° 37' 59.9"
- Longitude: 17° 56' 55.8"
- Altitude: 145 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 September 2024
Complete/correct this sheet: