[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Groß Berßen
- Commissioning:
- 1 turbine: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:
- Total nominal power: 3,050 kW
- Operational
- Onshore wind farm
- Operator: Enercon
Part #2:
- City: Haren
- Commissioning:
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Agro-WEA
Part #3:
- City: Haren
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Developer: Agro-WEA
Part #4:
- City: Haren
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #5:
- City: Haren
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #6:
- City: Haren
- Commissioning:
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 51' 57.2"
- Longitude: 7° 7' 52"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 52' 45.8"
- Longitude: 7° 8' 55.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 52° 52' 19.1"
- Longitude: 7° 8' 46.7"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 52° 52' 20.3"
- Longitude: 7° 8' 11.7"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 52° 52' 31.7"
- Longitude: 7° 8' 36.2"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 52° 52' 9"
- Longitude: 7° 9' 5.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 1 September 2022
Complete/correct this sheet: