[Back to previous page]
Generalities
|
|
Details
Part #1:
- 75 turbines: (manufacturer name not available)
- Total nominal power: 300,000 kW
- Under construction
- Offshore wind farm
- Developer: Huaneng Group
- Owner:
Part #2:
- Part: Phase 2
- Turbine(s): (manufacturer name not available)
- Planned
- Offshore wind farm
- Owner:
Localisation
Part #1:
- Latitude: 27° 21' 0"
- Longitude: 120° 45' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Phase 2
- Latitude: 27° 21' 0"
- Longitude: 120° 45' 0"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: