[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Glanta Commons l
- Commissioning:

- 9 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 20,700 kW
- Operational
- Onshore wind farm
- Developer: WPO
- Operator: Greencoat Renewables
- Owner:

- Source:

- Source:

- Source:

Part #2:
- Part: Glanta Commons ll
- Commissioning:

- 4 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developer: WPO
- Operator: Greencoat Renewables
- Owner:

- Source:

- Source:

- Source:

Part #3:
- Part: Glanta Commons lla
- Commissioning:

- 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
- Operator: Greencoat Renewables
- Owner:

- Source:

- Source:

Part #4:
- Part: Glanta Commons lla - Extension
- Commissioning:

- 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: Greencoat Renewables
- Owner:

- Source:

- Source:

Part #5:
- Part: Glanta Commons lla - Extension
- Commissioning:

- 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Total nominal power: 4,450 kW (downrated turbines)
- Operational
- Onshore wind farm
- Operator: Greencoat Renewables
- Owner:

- Source:

- Source:

Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Update for this sheet: 0
Complete/correct this sheet: