[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Phase 1
- City: Garzón
- Commissioning:

- 3 turbines: Bonus B24/150 (power 150 kW, diameter 24 m)
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Phase 2
- City: Garzón
- Commissioning:

- 5 turbines: (manufacturer name not available)
- Total nominal power: 2,500 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
Part #2:
Update for this sheet: 0
Complete/correct this sheet: