Generalities
|
|
Details
Part #1:
- City: Poppendorf
- Commissioning:
- 2 turbines: Enercon E101/3050 (power 3 050 kW, diameter 101 m)
- Hub height:
- Total nominal power: 6,100 kW
- Operational
- Onshore wind farm
Part #2:
- City: Broderstorf
- Commissioning:
- 2 turbines: e.n.o. energy 92 (power 2 200 kW, diameter 92.8 m)
- Hub height:
- Total nominal power: 4,400 kW
- Operational
- Onshore wind farm
Part #3:
- City: Bentwisch
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #4:
- City: Broderstorf
- Commissioning:
- 1 turbine: Vestas V112/3075 (power 3 075 kW, diameter 112 m)
- Hub height:
- Total nominal power: 3,075 kW
- Operational
- Onshore wind farm
Part #5:
- Part: Neuendorf
- City: Broderstorf
- Commissioning:
- 1 turbine: Enercon E115/4200 (power 4 200 kW, diameter 115.7 m)
- Hub height:
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 54° 6' 42.2"
- Longitude: 12° 15' 19"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 54° 6' 12.8"
- Longitude: 12° 14' 47.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 54° 6' 12.8"
- Longitude: 12° 14' 47.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 54° 6' 6.6"
- Longitude: 12° 14' 49.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Part: Neuendorf
- Latitude: 54° 5' 58.9"
- Longitude: 12° 13' 24.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 27 October 2023